Lyman Traffic Triangle

SCDOT proposes to make improvements to three main intersection areas in the town of Lyman:

  • US 29 at Pine Ridge Road (S-77)
  • SC 358 / Holly Springs Rd at Pine Ridge Road (S-77)
  • SC 129 at Holly Springs Rd & SC 292

The project is estimated to cost around $6.5 million which includes $1.35 million for preliminary engineering, $1.25 million for right-of-way, and $5.35 million for construction.

Watch this brief video for an overview of the proposed changes for the Lyman Traffic Triangle.
PDFs of the proposed intersection improvements can be downloaded below.


For more information on the project go to the Lyman Traffic Triangle project page on the SCDOT Project Viewer.



Update (June 2019):

  • PE is approximately 20% complete
  • ROW is scheduled to begin Fall 2020
  • Construction Letting is scheduled to begin Fall 2021